Made for field teams in the UAE

Every UAE regulation answer — with the exact clause

SparkProof AI answers DEWA and Dubai Building Code questions, citing the source document. FieldProof turns site walks into branded PDF reports. RamsProof generates submission-ready RAMS documents from work-type templates. In English and Arabic, on any phone.

Free plan included · No card required · English + العربية

Sage — try it now
You

Minimum cable size for a 32 A socket circuit?

Sage

For a 32 A final socket circuit, DEWA requires a minimum of 2.5 mm² copper conductors. Verify that voltage drop at the furthest outlet stays within the permitted limit, and derate for grouping and ambient temperature before you finalize the size.

Source: DEWA Electricity Wiring Regulations 2017

Tap a question — pre-recorded answers, no signup, no backend needed.

regulation fragments indexed and searchable
25,647+
regulatory documents indexed
34
average answer time
<5 s
full interface, right-to-left included
EN + AR

Three products, one account

Sign up once — all three tools are ready in your dashboard, no second login.

SparkProof AI

Sage — your AI assistant for DEWA 2017 compliance

  • Answers cite the exact regulation section
  • Photo analysis of panels and installations
  • Cable sizing, voltage drop and load calculators
Try SparkProof free

FieldProof

Commissioning and site inspections

  • Pass/fail checklists with photo evidence
  • Works offline — syncs when you are back online
  • Signed PDF reports and client share links
  • Snagging checklists linked to DEWA, DBC and UAE Fire Code clauses
  • Bilingual PDF output: English + Arabic in one document — your manager writes in English, your crew reads in Arabic
Try FieldProof free

RamsProof

RAMS generator for UAE contractors

Team plan
  • Work-type templates with prefilled hazards and controls
  • 5×5 risk matrix with residual-risk scoring
  • Submission-ready PDF, formatted for consultants
  • Bilingual PDF output: English + Arabic in one document — your manager writes in English, your crew reads in Arabic
Generate a RAMS

Free tool

DEWA Exam Trainer — test your knowledge of UAE wiring regulations

Fifty multiple-choice questions on the DEWA Electricity Wiring Regulations 2017: wiring, circuit protection, earthing, testing and load calculations. Instant feedback with the exact regulation reference. First 5 questions free — no account needed.

Try 5 questions free

Free tool

Cable Size Calculator & Load Schedule — free, no account needed

Size cables per BS 7671 with 50°C ambient derating and grouping factors, and build a load schedule with DEWA demand factors, main breaker and incoming cable — then export it to CSV.

Open the calculators

How it works

Three field workflows, three steps each — under one login.

  1. 1

    Start the job

    Ask a DEWA or DBC question in plain words

    Open an inspection from a ready-made template

    Pick the work type from a ready RAMS template

  2. 2

    Capture the evidence

    Get the answer with the exact clause cited

    Tick pass/fail and snap photos on your phone

    Answer a few questions about your project

  3. 3

    Hand over the deliverable

    Export a compliance note you can show the consultant

    Send a branded, signed PDF before you leave the site

    Download a submission-ready RAMS PDF

Built for Dubai from day one

Most tools are translated for the Gulf after the fact. VerixHQ is built here first.

English and Arabic, side by side

Every screen, report and answer works in both languages — with a real right-to-left layout, not a mirrored afterthought. Reports and RAMS documents export as bilingual PDFs: English and Arabic in a single file.

English

Earthing resistance must not exceed 1 Ω.

العربية

يجب ألا تتجاوز مقاومة التأريض 1 أوم.

On the foreman’s phone

Installs as a PWA in seconds — no app store, no IT ticket, works on any Android or iPhone already on site.

Basements and plant rooms

FieldProof downloads your project before you descend. Inspect offline; everything syncs when the signal returns.

Local regulations, first-class

DEWA Wiring Regulations, Dubai Building Code and Dubai Municipality requirements are the corpus — not a bolt-on.

Dubai · Abu Dhabi today — Sharjah, Ajman, Ras Al Khaimah, Fujairah and Umm Al Quwain next

Field guides, written from site experience

Practical playbooks for DEWA compliance and inspections — free to read, in English and Arabic.

SparkProof AI

DEWA Load Schedule & Load Calculation Requirements

What DEWA expects in your load schedule: connected load, demand factors and the diversity math that gets drawings approved.

Read the guide
FieldProof

Snagging App for UAE Contractors: Digitize Defect Management Before Handover

How a mobile snagging app captures defects, photos and branded PDF reports on site — even offline.

Read the guide
FieldProof

Dubai Municipality Site Inspections: What Contractors Must Prepare in 2026

Permits, completion certificates and third-party inspections — the practical checklist for DM site visits.

Read the guide

Install VerixHQ on your phone

Scan the QR code with your phone camera, then add the app to your home screen — no app store needed.

QR code that opens verixhq.com
verixhq.com

iPhone · Safari

  1. Open verixhq.com in Safari
  2. Tap the Share button (square with an arrow up)
  3. Tap "Add to Home Screen"

Android · Chrome

  1. Open verixhq.com in Chrome
  2. Tap "Install app" in the banner, or open menu ⋮
  3. Tap "Add to Home screen"

First cited answer in under 2 minutes

Create a free account and ask your first DEWA question — faster than a kettle boils.