SparkProof AI
Sage — your AI assistant for DEWA 2017 compliance
- Answers cite the exact regulation section
- Photo analysis of panels and installations
- Cable sizing, voltage drop and load calculators
Made for field teams in the UAE
SparkProof AI answers DEWA and Dubai Building Code questions, citing the source document. FieldProof turns site walks into branded PDF reports. RamsProof generates submission-ready RAMS documents from work-type templates. In English and Arabic, on any phone.
Free plan included · No card required · English + العربية
Minimum cable size for a 32 A socket circuit?
For a 32 A final socket circuit, DEWA requires a minimum of 2.5 mm² copper conductors. Verify that voltage drop at the furthest outlet stays within the permitted limit, and derate for grouping and ambient temperature before you finalize the size.
Source: DEWA Electricity Wiring Regulations 2017Tap a question — pre-recorded answers, no signup, no backend needed.
Sign up once — all three tools are ready in your dashboard, no second login.
Sage — your AI assistant for DEWA 2017 compliance
Commissioning and site inspections
RAMS generator for UAE contractors
Free tool
Fifty multiple-choice questions on the DEWA Electricity Wiring Regulations 2017: wiring, circuit protection, earthing, testing and load calculations. Instant feedback with the exact regulation reference. First 5 questions free — no account needed.
Free tool
Size cables per BS 7671 with 50°C ambient derating and grouping factors, and build a load schedule with DEWA demand factors, main breaker and incoming cable — then export it to CSV.
Three field workflows, three steps each — under one login.
Ask a DEWA or DBC question in plain words
Open an inspection from a ready-made template
Pick the work type from a ready RAMS template
Get the answer with the exact clause cited
Tick pass/fail and snap photos on your phone
Answer a few questions about your project
Export a compliance note you can show the consultant
Send a branded, signed PDF before you leave the site
Download a submission-ready RAMS PDF
Most tools are translated for the Gulf after the fact. VerixHQ is built here first.
Every screen, report and answer works in both languages — with a real right-to-left layout, not a mirrored afterthought. Reports and RAMS documents export as bilingual PDFs: English and Arabic in a single file.
English
Earthing resistance must not exceed 1 Ω.
العربية
يجب ألا تتجاوز مقاومة التأريض 1 أوم.
Installs as a PWA in seconds — no app store, no IT ticket, works on any Android or iPhone already on site.
FieldProof downloads your project before you descend. Inspect offline; everything syncs when the signal returns.
DEWA Wiring Regulations, Dubai Building Code and Dubai Municipality requirements are the corpus — not a bolt-on.
Dubai · Abu Dhabi today — Sharjah, Ajman, Ras Al Khaimah, Fujairah and Umm Al Quwain next
Practical playbooks for DEWA compliance and inspections — free to read, in English and Arabic.
What DEWA expects in your load schedule: connected load, demand factors and the diversity math that gets drawings approved.
Read the guideHow a mobile snagging app captures defects, photos and branded PDF reports on site — even offline.
Read the guidePermits, completion certificates and third-party inspections — the practical checklist for DM site visits.
Read the guideScan the QR code with your phone camera, then add the app to your home screen — no app store needed.
Create a free account and ask your first DEWA question — faster than a kettle boils.